Projects
Project:Construction of steel structure of oil refinery line, warehouse structure and administrative structure of Dane Talaie Dariush Company in Amirabad Port of Mazandaran, Iran
Employer:ALTIN TRADE PTE LTD ( Singapore)
Production tonnage title:1500 tons
Type of material used:ST37 steel sheet
Construction time:5 months
Production year:2021
Project:Construction of steel pipes used in the water transmission line with a diameter of 20 inches and a length of 4000 meters, Turkmenistan
Employer:Turkmenistan National Project
Production tonnage title:300 tons
Type of material used:ST52 steel sheet with a thickness of 4 mm
Construction time:3 months
Production year:2023